Ninh Cuong Bridge Project – National Highway 37B (2025)

29/09/2025

Ministry of Transport

Technical design consulting, construction supervision for the entire route

13 km

Length

12

Structures

18,000 billion VND

Total Investment

Project Description

Regional Connectivity – Upgrading Transport Infrastructure in the Red River Delta

Ninh Cuong Bridge crossing the Ninh Cơ River on National Highway 37B is one of the key projects contributing to the completion of the transportation network connecting the three provinces of Nam Dinh – Thai Binh – Ninh Binh. In 2025, the project will be implemented by the Thang Long Project Management Board, with the expectation of delivering a modern and safe bridge that meets the increasing demand for transportation.

Thong Nhat participates as a consultant in reviewing the technical design documents, cost estimates, and ground clearance pile design. Our team of experts has thoroughly evaluated structural solutions, durability, and investment cost estimates to maximize project efficiency. Beyond simply “standard compliance,” we place special emphasis on sustainable operational capability over the long term and the absolute safety of the structure.

The presence of Ninh Cuong Bridge will shorten inter-regional travel time, creating favorable conditions for logistics, trade, and services development. At the same time, the project also contributes to strengthening regional connectivity in the Red River Delta, reaffirming Thong Nhat’s role in national strategic infrastructure projects.

The first urban railway project in Vietnam with a length of 13km, 12 stations...

  • AASHTO (USA)
  • JIS (Japan)
  • EN (Europe)
  • TCVN (Vietnam)

Applying advanced technology and international experience in urban railway design and construction...

  • Detailed technical design
  • Professional construction supervision
  • Strict quality control
  • System operation training